ECONOMY: Summary of Nov 7, 2026

By · Published on

Illustration of an electric car connected to a charging outlet in a garage
AI-generated illustration; does not depict the actual event.

Tesla plans to wind down Cybertruck output, Google has acquired a Wyoming data centre site from Crusoe, police are hunting a lorry load of stolen Nvidia hardware, BMW has added a new motorcycle variant in India, and Six Flags has set a closing date for a Californian theme park.

Tesla will wind down Cybertruck production in 2027 to make room for the Cybercab

Elon Musk announced on Friday that Tesla will start winding down Cybertruck production around the middle of 2027 so that factory space can be used to build more Cybercab robotaxis. Writing on his social media platform, the chief executive did not say whether the pickup would be built elsewhere or dropped altogether, nor what would happen to outstanding orders. He told owners the existing fleet would stay on the roads for years and called the move the end of an era.

Sales of the stainless-steel pickup have fallen well short of the expectations Musk set. Estimates cited by an American news agency put US sales at 20,237 vehicles in 2025, down 48% on the previous year. Tesla does not report the model separately; its third-quarter 2026 figures showed 8,295 deliveries in a category that also covers the Semi and the Model S and Model X. Lead engineer Wes Morrill said the truck’s technology would live on in the Cybercab.

The Cybertruck was unveiled in November 2019, when Musk said it had drawn about 250,000 pre-orders within days, but repeated delays meant customer deliveries began only in late 2023 at the Texas plant. The vehicle has faced quality complaints and several recalls, and it was never sold in Europe, where its weight and sharp edges raised questions about pedestrian safety rules. The two-seat Cybercab, unveiled in 2024, is designed to run without a steering wheel or pedals.


Google acquires Crusoe’s Wyoming data centre site a day after unveiling its investment plan

Crusoe, a developer of artificial intelligence infrastructure, said on Friday that Google had acquired its data centre site in south-east Wyoming. The announcement came a day after the Alphabet subsidiary announced a $17-billion investment in the project, which will be its first data centre in the state. Financial terms of the sale were not disclosed. Crusoe said its role, covering site selection, government approvals and the power strategy, ended with the pre-development phase.

The campus was first developed by Crusoe together with Tallgrass Energy. Google said it would build the facility with Tallgrass Energy, Black Hills Energy, American Electric Power and Related Digital, expanding its computing capacity despite growing political resistance to such projects in parts of the United States. Crusoe’s chief executive, Chase Lochmiller, said the company already has contracts for more than 6 gigawatts of capacity, with a further 40 gigawatts or more under development.

Crusoe said it is also developing another Google data centre campus in Armstrong, which it announced earlier this year. Google’s data centres began in the early 2000s as clusters of ordinary computers serving its search engine and have grown into very large campuses that run its cloud platform, its video service and artificial intelligence workloads. Modern sites use the company’s own Tensor Processing Unit chips, and Google reported a fleet-wide power usage effectiveness of 1.09 in 2025.


Police investigate the theft of $11.4 million in Nvidia hardware bound for Texas

Oakland police in California are looking into the disappearance of six pallets of Nvidia equipment, valued at $11.4 million and destined for Fort Worth, Texas. Authorities said a lorry bearing the logo of a food transport company collected the load as arranged on 29 August, but the vehicle and its drivers then disappeared while heading south. No arrests have been announced, and the contents of the pallets have not been disclosed.

The lorry made several stops lasting hours before police lost its trail in San Bernardino County, according to investigators. The loss went unnoticed until early September and was reported to Oakland police on 13 September. Olaf Groth, a professor at the University of California, Berkeley, said Nvidia chips can fetch about double their American price abroad, with a $550,000 computing system selling for $1 million or more, and that thefts are growing larger and more organised.

Nvidia, founded in 1993 and based in Santa Clara, designs the graphics processors used in gaming and in artificial intelligence data centres, and its products have been targeted before. In 2025, police in Fremont and Union City investigated burglaries of the company’s cargo with combined losses above $7.5 million. In September, two pallets of graphics cards vanished from the airport in São Paulo, Brazil, and in 2021 a lorry loaded with graphics cards was stolen in California.


BMW adds a Sport version of the F 450 GS motorcycle in India

BMW has launched a Sport variant of its F 450 GS adventure motorcycle in India, priced at Rs 5.90 lakh. It sits just below the top GS Trophy version, costing Rs 25,000 less than that model and Rs 35,000 more than the Exclusive variant. The bike was introduced in three versions, Base, Exclusive and GS Trophy, and the new Sport model comes only in a red and black colour scheme with white and grey graphics.

The Sport variant carries almost all the equipment of the GS Trophy, including sport suspension, a quickshifter, off-road footrests, hand guards and extra riding modes, but it lacks the automatic clutch system offered only on the top version. Every F 450 GS uses a 420cc twin-cylinder engine producing 48 hp and 43 Nm of torque, paired with a 6-speed gearbox, and has a 6.5-inch colour display, heated grips and Bluetooth connectivity.

BMW Motorrad, the motorcycle division of the German carmaker, has built motorcycles since 1923, when it produced its first model with a flat-twin engine. Its smaller models are built in partnership with an Indian manufacturer: the G 310 and F 450 series come from the TVS plant in Hosur, in the state of Tamil Nadu. The brand has also widened the 450 range with a roadster called the F 450 R and a faired F 450 RR.


Six Flags sets September 2027 closing date for California’s Great America

Six Flags Entertainment said on Friday that California’s Great America in Santa Clara will close permanently on 6 September 2027, the Labor Day holiday, after a farewell season opening in March. The company said it would not take up an option to extend its lease on the land. Santa Clara councillor and mayor-elect Karen Hardy said she was frustrated, noting that it is the only large amusement park in the South Bay and Peninsula area.

The company had warned last year that 2027 might be the park’s final season. In May 2025, chief executive Brian Witherow told investors that the Santa Clara site ranked near the bottom of the group’s parks on profit margins. In a third-quarter earnings call on Thursday, Six Flags reported revenues of $1.17 billion and a loss of $366 million for the quarter. Landowner Prologis has not said what it plans for the 112-acre site.

The park opened on 20 March 1976, built by Marriott as one of two near-identical parks, the other in Illinois. In 2022 its then owner, Cedar Fair, sold the land to Prologis for $310 million and leased it back through June 2028, with an option of five more years. Cedar Fair merged with Six Flags in 2024. Today its rides number more than 40, nine of them roller coasters, alongside a water park.

In this topic